Transport system for phosphate at Yara Norway Porsgrunn

Tratec Agdermaskin supplied a silent and protected system for feeding and transport of phosphate in 2015

Tratec Agdermaskin has delivered a plant for feeding and transporting phosphate powder to Yara Norway in Porsgrunn. The system was delivered and went into operation in 2015.

Brief transport system description:
The powder is transported from 5 silos to Yara's production plants. Screw feeders handles output from the silos and into two longitudinal belt conveyors. The belt conveyors are built with a roof and side walls, which ensures that the powder is sheltered from wind and weather. All conveyors are built in stainless steel.

The transport system is characterized by:

  • A silent operation
  • Solid solutions for protection against rain and snow
  • Service platforms for good access
  • Very good corrosion resistance

Please contact us if you are interested in more information about Tratec Agdermaskin’s material transport systems.

Get in touch

Rune Støylen
Rune Støylen
Manager Service
+47 90 99 09 39

Work with us?

We are eager to help you with your project.  

Get in touch