![Transport system for phosphate at Yara Norway Porsgrunn](https://s3-eu-west-1.amazonaws.com/tratec/_sixteenNine/Yara-22.04.2016_21_318539.jpg)
Tratec Solutions has delivered a plant for feeding and transporting phosphate powder to Yara Norway in Porsgrunn. The system was delivered and went into operation in 2015.
Brief
transport system description:
The powder is transported from 5 silos to Yara's production plants. Screw
feeders handles output from the
silos and into two
longitudinal belt conveyors. The belt conveyors are built with a roof and side walls,
which
ensures that the powder is sheltered from wind and weather. All conveyors are
built in stainless steel.
The
transport system is characterized
by:
- A silent operation
- Solid solutions for protection against rain and snow
- Service platforms for good access
- Very good corrosion resistance
Please contact us if you are interested in
more information about
Tratec Solutions
material transport systems.
Get in touch
![Jørgen Smith](https://s3-eu-west-1.amazonaws.com/tratec/agdermaskin/Ansatte/_medium/Jørgen-Smith.jpg)
![](https://s3-eu-west-1.amazonaws.com/tratec/_large/Yara-22.04.2016_21_318539.jpg)
![](https://s3-eu-west-1.amazonaws.com/tratec/_large/Screenshot_14.jpg)
![](https://s3-eu-west-1.amazonaws.com/tratec/_large/Screenshot_28.jpg)